Hai
I'm Aisal I'm Risal Faisal

Memiliki pengalaman dan kemampuan dalam melakukan engineering calculation di bidang MEP

RISAL FAISAL S.T.,

PORTFOLIO

Foto ini menunjukkan Risal Faisal, seorang engineer profesional di bidang MEP, sedang melakukan perhitungan sistem kabel fire alarm. Kegiatan ini mencakup analisis kebutuhan kabel, skema jalur instalasi, dan estimasi kapasitas deteksi untuk memastikan sistem fire alarm berfungsi optimal sesuai standar keselamatan kerja. Keahlian ini sangat penting dalam proyek pembangunan gedung, perkantoran, dan fasilitas industri.

GENERAL CALCULATION REPORT CABLING FIRE FIGHTING SYSTEM

This document contains the results of the technical calculation of voltage drop for the fire alarm cable system in the three main buildings of the Freeport Manyar Project, including the Main Gate, Main Admin, and Process Admin. Prepared by Risal Faisal, this report confirms the cable’s compliance with fire alarm system safety standards.

Risal Faisal sebagai calculation engineer sedang melakukan simulasi perhitungan penerangan sesuai standar teknis

LIGHTING CALCULATION REPORT TYPICAL COOL DOWN ROOM

This report presents the results of a room lighting simulation using Dialux software for the Cool Down room in the MMR project. Prepared by Risal Faisal, this document includes lamp specifications, lighting layout, actual and target lux values, as well as energy efficiency of indoor, outdoor, and emergency lights.

Risal Faisal melakukan perhitungan sistem HVAC pada Main Laboratory Area proyek Manyar Maju Refinery

HVAC CALCULATION REPORT MAIN LABORATORY AREA

This document presents the calculation of cooling loads and HVAC requirements for the Main Laboratory Area of Manyar Maju Refinery project. The report includes heat load simulation, selection of AC and exhaust fan types, positive-negative pressure calculation, and ducting design based on SNI standards and project specifications.

Risal Faisal menyusun dokumen metode kerja instalasi listrik proyek Freeport Manyar

WORK METHOD STATEMENT FOR ELECTRICAL INSTALLATION

This document details the electrical installation work methods on the Freeport Manyar Non-Process Building project. Prepared by Risal Faisal, the report covers the scheme of work for the installation of lights, panels, protection systems, grounding, air conditioning, and smoke detectors, including HSE, JSA, tools, materials, and technical stages. All work was carried out with safety procedures, quality verification, and following engineering standards and applicable regulations.

Let’s Work!

honesty is the definition of being human